Rain Effect! Repair Work Carried Out on Road outside Airport Boundary Wall

Saturday, July 9, 2022

Repair work is being carried out on the road outside the airport boundary wall on Adyapady Road. A 10-15 metre stretch of concrete road has caved in and a nearly 8-meter ditch was created after water washed away the culvert two days ago. Only the concrete road was hanging over the hollow beneath.

PWD authorities have since dismantled this suspended portion of concrete road and have initiated the repair work. The airport compound retaining wall is abutting this caved-in portion of the road and there are no visible signs of any structural engineering issues to this wall built on a solid foundation.

Share